2. Recommended Maintenance Schedule
Establishing a routine protocol ensures peak performance and keeps your unit compliant with biomedical standards.
| Frequency | Maintenance Task | Purpose |
|---|---|---|
| Daily | Clean door gaskets and mating surfaces with a damp cloth. | Ensures an airtight seal and prevents vacuum/pressure leaks. |
| Daily | Inspect the chamber rim for debris or residue. | Prevents seal degradation. |
| Daily | Drain and refresh reservoir water (if applicable). | Prevents stagnant water contamination and scale buildup. |
| Weekly | Clean the chamber and tray racks using OEM-approved cleaners. | Removes mineral scale and organic film buildup. |
| Weekly | Inspect and clean the chamber drain strainer/filter. | Ensures proper steam circulation and complete drainage. |
| Monthly | Test the safety valve / pressure relief valve. | Ensures emergency pressure-relief systems function correctly. |
| Annual / Semi-Annual | Schedule certified Biomedical PM (Preventative Maintenance). | Replaces worn seals/valves, calibrates sensors, and validates pressure safety. |